WQ12-05-CIP Midway City stormwater drain Phase III
County of Orange
High
Active
Redevelopment
Other
North OC 4th Term - 2009 (2011 Model WQMP and TGD)
01/09/2014
Exempt
Anaheim Bay-Huntington Harbor
8.60
Not Provided

Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %
Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %
Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %

This WQMP’s parameters have changed since the last model run; a new model run is pending to re-calculate results. Parameters for related detailed BMPs have changed since the last model run; a new model run is pending to re-calculate results. This BMP's parameters have changed since the last model run; a new model run is pending to re-calculate results.

Results last calculated at

Model results for this WQMP are awaiting calculation.

Model results for this BMP are awaiting calculation.

Locations
No parcels have been associated with this WQMP
Land Use Statistics

No treatment area is provided for this Water Quality Management Plan. Land Use Statistics cannot be determined until a treatment area is provided.

Associated Parcels
Currently viewing of Reset  Download Table
BMPs

Modeling Approach Learn about WQMP Modeling Options

Detailed
This WQMP is modeled by inventorying the associated structural BMPs and defining their delineations. The performance of each BMP is modeled based on its modeling parameters and the attributes of the delineated tributary area.
Simplified
This WQMP is modeled by entering simplified structural BMP modeling parameters directly on this WQMP page.

Inventoried Structural BMPs

OC-PB-WQ1205-1 Proprietary Biotreatment Yes No - As Modeled Verified 0.44 ac
OC-PB-WQ1205-2 Proprietary Biotreatment Yes No - As Modeled Verified 0.75 ac
OC-PB-WQ1205-3 Proprietary Biotreatment Yes No - As Modeled Verified 0.43 ac
OC-PB-WQ1205-4 Proprietary Biotreatment Yes No - As Modeled Verified 0.30 ac
OC-PP-WQ1205-5 Permeable Pavement Yes No - As Modeled Verified 0.13 ac

Simplified Structural BMPs

Currently viewing of Simplified Structural BMP Reset  Download Table

Source Control BMPs

No Source Control BMPs are present or have a note.

WQMP O&M Verification