Basics
Vista Hermosa Sports Park
City of San Clemente
High
Active
New Development
Park
South OC 3rd Term - 2002 (2003 Model WQMP)
San Clemente Coastal Streams
51.90
Partial (>5mm but less than full sizing)
Not Provided

Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %
Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %
Water Balance Components Volume (cu-ft/yr) Percent of Inflow
--
%
%
%
Pollutant Load Reduced Percent Reduced
kg %
kg %
kg %
billion CFUs %
g %
g %
g %

This WQMP’s parameters have changed since the last model run; a new model run is pending to re-calculate results. Parameters for related detailed BMPs have changed since the last model run; a new model run is pending to re-calculate results. This BMP's parameters have changed since the last model run; a new model run is pending to re-calculate results.

Results last calculated at

Model results for this WQMP are awaiting calculation.

Model results for this BMP are awaiting calculation.

Some of this WQMPs structural BMPs are not fully parameterized for modeling, or have missing or unverified delineations, so these results may be incomplete or inaccurate.

Locations
80.74 acres
Land Use Statistics

Land Use Statistics have not been calculated for this Water Quality Management Plan

Associated Parcels
Currently viewing of Reset  Download Table
BMPs

Modeling Approach Learn about WQMP Modeling Options

Detailed
This WQMP is modeled by inventorying the associated structural BMPs and defining their delineations. The performance of each BMP is modeled based on its modeling parameters and the attributes of the delineated tributary area.
Simplified
This WQMP is modeled by entering simplified structural BMP modeling parameters directly on this WQMP page.

Inventoried Structural BMPs

SCL-DB-VHS-1 Dry Extended Detention Basin No No - As Modeled
Talega FC Basin - C1 Dry Extended Detention Basin Yes No - As Modeled Verified 40.93 ac

Simplified Structural BMPs

Currently viewing of Simplified Structural BMP Reset  Download Table

Source Control BMPs

No Source Control BMPs are present or have a note.

WQMP O&M Verification
Verification Date Last Edited Last Edited By Type of Verification Visit Status Verification Status Draft or Finalized?
09/07/2023 10/03/2023 Samantha Barchet Jurisdiction Performed Initial Annual Verification Draft Draft
09/07/2023 10/03/2023 Samantha Barchet Jurisdiction Performed Initial Annual Verification Deficiencies are Present and Follow-up is Required Finalized
08/31/2022 12/16/2022 Stephanie Bone Jurisdiction Performed Initial Annual Verification Deficiencies are Present and Follow-up is Required Finalized
06/05/2020 06/05/2020 Stephanie Bone Jurisdiction Performed Initial Annual Verification Deficiencies are Present and Follow-up is Required Finalized