Basics
Kohls
City of Laguna Niguel
High
Active
Redevelopment
Commercial
South OC 2nd Term - 1996
08/09/2002
Exempt
Aliso Creek
CLN_WQMP050
8.60
Not Provided

This WQMP is modeled using the detailed approach, but no structural BMPs have been inventoried, so no results are available.

Locations
8.79 acres
Land Use Statistics
(ac) (ac)
Commercial 3.51 3.17
Transportation - Local Road 0.01 0.01
Total 3.53 3.18

Land Use Statistics are derived from the inventoried structural BMPs and may not exactly match the Calculated Parcel Area shown above.

Associated Parcels
Currently viewing of Reset  Download Table
BMPs

Modeling Approach Learn about WQMP Modeling Options

Detailed
This WQMP is modeled by inventorying the associated structural BMPs and defining their delineations. The performance of each BMP is modeled based on its modeling parameters and the attributes of the delineated tributary area.
Simplified
This WQMP is modeled by entering simplified structural BMP modeling parameters directly on this WQMP page.

Inventoried Structural BMPs

No Structural BMPs in Detailed Inventory have been selected.

Simplified Structural BMPs

Currently viewing of Simplified Structural BMP Reset  Download Table

Source Control BMPs

Applicable Routine Structural Source Control BMPs
Source Control Attribute Is Present Notes
Design Trash Enclosures to Reduce Pollutant Introduction Yes Imported from spreadsheet on 2018-12-06
WQMP O&M Verification

No Verifications have been provided