Basics
Westminster Channel trash boom

Water Quality
Partial (>5mm but less than full sizing)
Not Provided

Unknown

Auto delineated for estimate of area treated. No tributary area info available.
Images
Location
Centralized
62.92 ac
Verified
Not Provided
Field Visits
Currently viewing of Field Visits Reset  Download Table
Funding Events

No Funding Events identified for this Treatment BMP

Benchmark & Threshold Values
Observation Type Benchmark Threshold
Material Accumulation as Percent of Total System Volume 0% 40%